Skip to content
MMK Remodel logo MMK Remodel
Shower pan replacement

Nicholasville • Lexington • Louisville • Central Kentucky

Shower Pan Replacement

Shower pan replacement for Nicholasville & Lexington homes. Replace damaged, cracked, or outdated shower pans with proper waterproofing and drainage for lasting performance.

Shower Pan Replacement in Nicholasville & Lexington

Shower pans are the foundation of any shower. When they fail or become outdated, proper replacement prevents water damage and restores shower function.

Serving Nicholasville, Lexington, and nearby communities with residential and light commercial remodeling, renovations, and handyman support including shower pan replacement.

Ideal for

  • Damaged or cracked shower pans
  • Outdated shower pan upgrades
  • Shower renovations
  • Accessibility improvements
  • Preventive maintenance

Shower Pan Replacement Process

Shower pan replacement involves removing the old pan, addressing any underlying damage, and installing a new pan with proper waterproofing and drainage.

Assessment and Planning

We inspect the existing pan, surrounding tile, and subfloor to identify the scope of replacement needed. This determines whether tile work is also required.

Pan Removal

Careful removal of the existing pan and any damaged materials. We protect surrounding tile when possible and assess subfloor condition.

Subfloor Preparation

Subfloors must be sound, level, and properly sloped toward the drain. We repair or replace subflooring as needed before installing the new pan.

Pan Options

Pre-formed fiberglass or acrylic pans offer quick installation. Custom mud-set pans allow any size or shape and accommodate curbless designs. We recommend based on your situation.

Waterproofing

Proper waterproofing membrane installation prevents leaks. We use industry-standard systems that protect your subfloor and surrounding areas.

Drain Installation

New drain installation with proper slope ensures water flows correctly. We coordinate drain type with your pan selection.

Tiling a walk-in shower renovation
Quality shower pan replacement workmanship

Key benefits

  • Proper waterproofing
  • Correct drainage slope
  • Multiple pan options
  • Coordinated with tile work
  • Long-lasting results

Shower Pan Replacement inspiration

Finish styles, materials, and layouts we can deliver for shower pan replacement.

Tile setter working on a hexagonal mosaic floor

What's included

  • Existing pan removal
  • Subfloor assessment and repair
  • New pan installation
  • Waterproof membrane installation
  • Drain installation
  • Proper slope and drainage
  • Coordination with tile work

All services

How the project runs

  1. Share scope + photos
  2. We confirm details and schedule
  3. We complete the work and walkthrough

See our process

Shower Pan Replacement FAQs

Quick answers before you request a quote.

How do I know if my shower pan needs replacement?

Signs include cracks, leaks, soft spots, or visible damage. Water stains on ceilings below or persistent moisture issues often indicate pan problems.

Can you replace just the pan without retiling?

Sometimes, if surrounding tile is in good condition and removal doesn't damage it. Often, replacing the pan requires some tile work for proper integration.

What's the difference between pre-formed and custom pans?

Pre-formed pans are fiberglass or acrylic units in standard sizes. Custom mud-set pans are built on-site from concrete, allowing any size or shape including curbless designs.

How long does a new shower pan last?

Properly installed shower pans last 20-30+ years. Quality installation and proper maintenance extend lifespan significantly.

Can I convert to a curbless shower during pan replacement?

Often yes, if your bathroom structure allows. Curbless designs require floor recessing or linear drains. We assess feasibility during planning.

Installer spreading mortar for large format floor tiles
Quality finishes in every project

Plan your next step

Share your shower pan replacement project details and we will schedule next steps.