Skip to content
MMK Remodel logo MMK Remodel
Professional installation work

Nicholasville • Lexington • Louisville • Central Kentucky

New Construction Finish-Out

New construction finish-out for Nicholasville & Lexington. We handle interior trim, paint, flooring, and punch list so your new build is ready for move-in.

New Construction Finish-Out in Nicholasville & Lexington

When the shell is up and rough-ins are done, we take over the finish work: trim, paint, flooring, and final punch so the house is complete and clean.

Serving Nicholasville, Lexington, and nearby communities with residential and light commercial remodeling, renovations, and handyman support including new construction finish-out.

Ideal for

  • Custom home builders
  • Owner-builders
  • Small development or spec homes
  • Addition or ADU finish
  • Need reliable finish crew

What We Do in New Construction

We focus on the interior finish phase — after framing, rough plumbing, electrical, and HVAC are in. We install trim, paint, flooring, and complete the punch list.

Trim-Out

Baseboards, door and window casing, crown (if specified), and interior doors. We hang doors, install casing, and run base so everything is ready for paint.

Paint

Interior walls and ceilings — primer and finish coats. We paint after trim is installed so we can caulk and paint trim and walls together for a clean look.

Flooring

Hardwood, LVP, carpet, tile — per plan. We install after trim so base sits on the finished floor. We coordinate with the builder's schedule.

Punch List

Final touch-up, fill nail holes, fix nicks, and address builder or homeowner punch items. We work through the list until the house is ready for occupancy.

Coordination

We work with your builder or GC. We need a clear scope (what's in, what's not) and access to the schedule so we don't block or get blocked by other trades.

Warm white shaker kitchen with quartz island and black hardware
Quality new construction finish-out workmanship

Key benefits

  • One crew for trim, paint, floor
  • Clear scope and schedule
  • Punch list to completion
  • Quality and clean job sites
  • Used to builder timelines

New Construction Finish-Out snapshots

Real new construction finish-out projects — styles and finishes we've delivered.

Hardwood floor finishing
Painter rolling paint on an interior wall
Cozy porch with outdoor living space
Handyman installing recessed lighting in a kitchen

What's included

  • Trim installation (base, casing, doors)
  • Interior paint (walls, ceilings, trim)
  • Flooring (if in scope)
  • Punch list (fill, touch-up, repairs)
  • Cleanup

All services

How the project runs

  1. 1 Reach out Share plans, scope (trim, paint, floor, punch), and timeline.
  2. 2 Walk-through & quote We review plans and site, then provide a written quote and schedule.
  3. 3 Schedule We lock in start date and coordinate with GC or builder.
  4. 4 Finish-out We complete trim, paint, flooring, and punch with clean job sites.
  5. 5 Final walk We walk with you or the builder and close out punch list.

See our process

New Construction Finish-Out FAQs

Quick answers before you request a quote.

Do you work with builders and GCs?

Yes. We're used to coordinating with builders, subs, and schedules. We need clear scope (what we're responsible for) and access dates. We don't do framing or rough MEP.

What if the builder's schedule slips?

We'll reschedule. We understand construction timelines change. We ask for as much notice as possible so we can slot you in when the house is ready for us.

Can you do just trim and paint (no flooring)?

Yes. We can scope trim and paint only; flooring can be another trade or us in a separate phase. We'll quote what you need.

Quality finishes in every project

Plan your next step

Share your new construction finish-out project details and we will schedule next steps.